Detail

Part Details

Part Number: WR:Grab-Orange Peel

Description: Orange Peel Grab MMGL 8000-4 General Overhaul Workshop Cost To provide labour, equipment and facility to carry out following recommended Scope of Work: -Dismantle / assemble complete Grab / base unit / HPU -remove / install all 6x shells and replace pins and bushes where required -inspect shell tips and replace if required -remove / install six (6) lifting cylinders for recommended overhaul -remove / install E-motor for recommended overhaul -Inspect Connection box (insulation, terminals, plug connections) -remove / install hydraulic pump for recommended overhaul -remove / install hydraulic valve block for recommended overhaul -replace all hydraulic hoses and fittings (where required) -clean out hydraulic tank and fill up new hydraulic oil (393ltr), replace return filter -overhaul lubrication system and replace all lubrication hoses -remove / install top pins for inspection -NDT testing on all pins and load bearing welding seams

Please fill out the form below to send us an enquiry about this part. Our team will get back to you as soon as possible.

Scroll to Top