Detail

Part Details

Part Number: WR:Grab_Tobu_OH

Description: TOBU Grab General Overhaul Workshop Cost: To provide labour, equipment and facility to carry out following recommended Scope of Work: -dismantle / assemble complete Grab -remove / install both shells and replace pins and bushes where required -remove / install all 4x pressure rod and replace pins and bushes where require -remove / install rope sheaves in the upper frame and replace bushes and pins where required -check condition of Nylon cushion rings -remove / install rope sheaves in the middle frame and replace bushes and pins where required -inspect buffer plate pack and rubber buffer on middle frame -inspect rope fix points and upper lifting point -remove / install hydraulic cylinder for recommended overhaul -remove / install hydraulic valve block for recommended overhaul -replace all hydraulic hoses and fittings (where required) -clean out hydraulic tank and fill up new hydraulic oil (150ltr, grade46), replace return filter -NDT testing on all pins and load bearing welding seams

Please fill out the form below to send us an enquiry about this part. Our team will get back to you as soon as possible.

Scroll to Top