You're viewing a static version of our catalog. For live search:
We respond within 1–2 business days.
Part Number | Description | Action |
---|---|---|
WR:331.009.005 | Labour Charges For Hydraulic Rotary Connector Standard Overhaul To dismantle and clean for inspection, to replace all seals and bearings, to reassemble and pressure test the individual sections. Note: Price is excluding overtime, parts, machining / fabrication costs and consumable | Enquire |
WR:3327643 | Rope Sheave Overhaul - To remove existing bearings and clean all parts for inspection, - To power brush sheave to bare metal - To carry out crack testing on all bearing seating faces, welding seams & load bearing areas - To measure Rope Sheave groove area - To to establish a QC report - To re-paint sheave with x1 layer of primer - To assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price excludes, parts, machining works, overtime and consumables. | Enquire |
WR:35 T Waterbag Assy (Daily Rental) | 35 t waterbags with full acessories. (Daily Rental Rate for local) - 35 t waterbag - 55 t shackles (2nos) - 50 t loadcell | Enquire |
WR:35050EH GB Overhaul | Standard Gearbox Overhaul Slewing Gearbox Model: SKK-35050EH To open up gearbox and clean all parts for inspection, to carry out NDT testing on all bearing seating faces and gears, to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:356-9310 | Hydraulic Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:35T Waterbag Assy (Oversea Rental) | 35T Waterbag rental ( Oversea Rental) c/w: - 35T Waterbag. - 35T Telemetry Tensile Load cell with cert. - 35T Shackles. (2 nos) **Forwarder to be arranged by Owner. | Enquire |
WR:36.09-6000 | Boom Repair KGW EH 36/31T-21/24M Boom Dwg 36.09-6000 -To carryout thickness measurement and prepare the report accordingly. -To arrange marker/ fitter to carry out alignment check and to prepare alignment report accordingly. -To arrange labour to carry out general cleaning on crane boom for NDT & carryout MPI test on all Welding Seams. -To arrange mechanical testing -To fabricate and install new crane boom section at boom tip ( 16mmt plate ) & pad eyes ( 38mm t ) x 4 location ( including labour material & consumables) -To carryout loading & unloading of boom in workshop | Enquire |
WR:3799998 | Slewing Hydraulic Motor Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: Bearings & Seals Note: - Excluded from our offer are overtime, other parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:388-7571-801 | Single Fall Hook, SWL 15T Standard Overhaul Dismantle the hook block and clean for inspection, perform NDT testing on all load bearing areas - hook / trunnion / hook housing, dimensional inspection report, replace Thrust bearing, replace all screws with XYLON coated screws, use of lock wire and lock nuts, overhauled hook to conform to DROPS, stencil SWL, complete documentation. Note: Price is excluding parts, machining / manufacturing costs, sandblasting / painting and consumables. | Enquire |
WR:388.0362-801 | Pressure Accumulator to charge up to 15 Bar and do a pressure test. | Enquire |
WR:388.0369-801 | Electric Motor Standard Overhaul | Enquire |
WR:388.1221-801 | Unloading Valve Standard Overhaul Labour charges to disassemble unloading valve and clean all parts for inspection, polishing all spools, change all seals & fittings where required. To also carryout complete full function testing of the unloading valve. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:388.1669-801 | Feed Pump Standard Overhaul Labour charges to disassemble hydraulic pump and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:388.3127-801 | Slewing Hydraulic Motor (PARKER, F12-060) Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: Seals & Bearings Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:388.5046-801 | Hydraulic Cylinder (Slewing lock) Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:388.6376-801 | Standard Overhaul of Counter Balance Valve of the Luffing Cylinder To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:389.1557-001 | To fabricate 1 x New Shaft | Enquire |
WR:389.3916-801 | Hydraulic Motor A6VM200 Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: Seals & Bearings Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:389.3916-801_AME | Hoist Motor Refurbishment - Disassembly - Clean all components - Inspect all components - Replace seals and bearings - Assemble - Test and QC Note: Any components found to be excessively worn or damaged during inspection will be quoted additional | Enquire |
WR:390.8947-803 | Wire Rope Luffing Dia 32mm x 222.5 mtrs, Inspection To provide manpower & equipment to carryout E-MAG Inspection on the luffing wire rope dia 32mm x 222.5 meters spooled on a drum c/w one end DIN 3091 solid thimble, other end tapered. Note: -Price includes use of 2 spooler machine, emag unit, team of personal, in-house visual and emag examination report -Inspection to be done on weekday (mon-fri) from 9am to 5PM -Inspection can be arrange on weekend (sat & sun) from 9am to 12PM at a additional charge of SGD 800.00 -Overtime charges will be at SGD800.00 after 5PM (weekday) and 12PM (sat&sun) | Enquire |
WR:390.8964-804 | Wire Rope Hoisting Dia 34mm x 294.5 mtrs, Inspection To provide manpower & equipment to carryout E-MAG Inspection on the hoisting wire rope dia 34mm x 294.5 meters spooled on a drum c/w one end DIN 3091 solid thimble, other end tapered. Note: -Price includes use of 2 spooler machine, emag unit, team of personal, in-house visual and emag examination report -Inspection to be done on weekday (mon-fri) from 9am to 5PM -Inspection can be arrange on weekend (sat & sun) from 9am to 12PM at a additional charge of SGD 800.00 -Overtime charges will be at SGD800.00 after 5PM (weekday) and 12PM (sat&sun) | Enquire |
WR:391.0458-801 | Hoisting Hydraulic Motor (A6VM200) Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: Seals & Bearings Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:391.0468-801 | Jib Hinge Bearing Housing Labour charges to dissassemble Jib Hinge Bearing Housing, remove existing bearing and clean all parts for inspection, to re-assemble with new bearing, seal and with broken parts renewed / repaired. Note: Price excludes, parts, machining works, overtime and consumables. | Enquire |
WR:39127 | Slew Gear Box S445 Standard Overhaul To dismanlte slewing gearbox and clean all parts for inspection.To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after | Enquire |
WR:3N990383 | Luffing Cylinder Standard Overhaul Type: HC-CA-N-250-347x236x2750 To open up cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test with 368 bar on piston side and 368 bar on ring side. Note: Price excludes overtime, materials, parts and additional work such as chroming, honing & machining wors. | Enquire |
WR:3SK93001 | Hatch Cover Hydraulic Cylinder Standard Overhual Maker: Uchida oil hydraulic cylinders Type:160 x140x1150 Drawing nr : 3SK 93001 To open up cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test with 310 bar on piston side and 310 bar on ring side. Note: Price excludes overtime, parts and additional work such as Chroming & honing & machining work | Enquire |
WR:3V-FH2B-MK-Pump | Steering Gear Pump Standard Overhaul Make: Mitsubishi Type: 3V-FH2B-MK Desc: Hydraulic Pump (Steering Gear) Repair Scope: Labour charges to disassemble Hydraulic pump and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing Parts Included: Bearings & Seals Note: Price is without overtime, other parts, machining / manufacturing costs and consumables. | Enquire |
WR:4-58103 | SWL 200Mto 8- Fall Hook block Standard Overhaul (non-urgent) Labour charges to dismantle the 8-fall Hook block, clean and inspect, perform NDT testing on all load bearing areas / rope sheaves / axle & seating surfaces, dimensional check of all seats / axle / rope sheave groove / bearing seats, re-assemble with new bearings and seals and XYLON coated screws, secure with lock wire & lock nuts, conform to DROPS, full documentation Stencil SWL on hook block NDT testing of hook after onshore load testing Note: Price is non urgent basis, and excluding parts, machining / manufacturing costs, sandblasting / painting and consumables. | Enquire |
WR:4.25 04.2510141 | Zollern Gearbox Standard Overhaul To dismantle gearbox and clean all parts for inspection.To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:4.27-1000801-1283 | Luffing Winch Standard Overhaul Labor charges to disassemble winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: -Price is excluding overtime, parts, machining / manufacturing costs and consumables. -Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:4.27:1000801:1283 | Luffing Winch Standard Overhaul Labor charges to disassemble winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: -Price is excluding overtime, parts, machining / manufacturing costs and consumables. -Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:4.29 042910492 | Overhaul Rope Winch (Aux Winch): Labour and workshop cost for dismantle / assemble, clean for inspection, NDT testing of all gears and shafts, replace all bearings and seals, replace all screws, touch up painting, function test with test report. Note: -Price excludes parts, overtime (urgent basis), machining and fabrication and full scale sandblasting / painting (if required). | Enquire |
WR:4003849 | Hydr, Motor (A6VM200) Overhaul on TOP URGENT Basis (within 24hrs) Labour to dismantle, clean and inspect all parts for damage. Replace seals, bearings and complete rotary group. Re-assemble the unit after servicing, and conduct a full dynamic test for the motor, with report. - Standard Overhaul Labour Charges : $3,500.00 SGD - Additional Overtime Labour Charges : $1,500.00 SGD - Parts Supplied : Seals , Bearing & Complete rotary group - $12,400.00 SGD Total: $3500 + $1500 + $12400 = $17,400 Note: -Price includes overtime & parts. -All parts offered are genuine from maker & ex-stock. -Price excludes any machining / manufacturing costs and consumables. | Enquire |
WR:4004267 | Winch Gearbox Standard Overhaul Model: ZHP 05.19 10046 Labour charges to disassemble winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:400tonHookBlock | 12- Fall pulley block with Swivel Hook SWL 400Mto Standard Overhaul (non-urgent) Overhaul on urgent basis, please add 30% Dismantle the 12-fall rope pulley block, clean and inspect, perform NDT testing on all load bearing areas / rope sheaves / axle & seating surfaces, dimensional check of all seats / axle / rope sheave groove / bearing seats, re-assemble with new bearings and seals and XYLON coated screws, secure with lock wire & lock nuts, conform to DROPS, full documentation Dismantle the hook shackle, clean and inspect, perform NDT testing on all load bearing areas / hook / shackle / hook nut/ axle & seating surfaces, dimensional check of hook / axle and seats, assemble with new thrust bearing, hook and shaft guide rings, use XYLON coated screws and secure with lock wire, conform to DROPS. Stencil SWL on hook block NDT testing of hook after onshore load testing Note: Price is non urgent basis, and excluding parts, machining / manufacturing costs, sandblasting / painting and consumable | Enquire |
WR:401-9310 | Hatch Cover Hydraulic Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:4088WH219 | Planetary Gearbox Standard Overhaul To open up winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:4100087890 | Electric Motor with brake Standard Overhaul Make:BLM, Type: F22-C MB 4225, 61/74KW, 4pole with Electro Frein Magnetic Brake, Type: F22-C, 100V 1. Dismantle the unit and separate the bearings, brake & Coupling 2. Conduct electrical test like DLRO, IR test, Surge & Impedance check 3. Clean the stator with chemical and Steam and bake into oven 4. Varnish the stator coil and bake into oven 5. Remove the excess varnish 6. Clean the rotor and parts with steam and chemical and bake into oven 7. Remove the brake unit and conduct Electrical test 8. Clean and bake the brake coil 9. Dynamic balance the rotor assembly 10. Run-out check on rotor shaft 11. Renew both end bearings and oil seal if any 12. Measure the bearing housing and journals dimensions 13. Assemble the unit 14. Conduct No Load Run Test 15. Provide Service report Note: Price excludes overtime, parts, machining works and consumables. | Enquire |
WR:42049456 | Hatch Cover Hydr Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:42049457 | Hatch Cover Hydr Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:42049493 | Hatch Cover Hydr Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:4215RedWingShoe | 4215 Red Wing Men's 6-Inch Boot Brown | Enquire |
WR:4261.43.09904.96 | Stiebel Gearbox Standard Overhaul To dismantle gearbox and clean all parts for inspection.To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed /repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs,storage cost and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:4281.72.09900 | Splitter Gearbox Overhaul Crane: Kenz Crane (331.03) (dry docking sheet 331.03.17) To dismantle, clean and inspect, NDT testing on all gears and shafts, re-assemble with new seals only, touch-up painting Highly recommended to replace all bearings as well Note: - Price is w/o overtime, parts,machining and w/o bearings and consumables. | Enquire |
WR:4281.72.09900 -1 | Splitter Gearbox Inspection Only (Spare Unit) Crane: Kenz Crane (331.03) (dry docking sheet 331.03.17) To dismantle, clean and inspect, NDT testing on all gears and shafts, re-assemble with new seals only, touch-up painting Highly recommended to replace all bearings as well Note: - Price is w/o overtime, parts,machining and w/o bearings and consumables. | Enquire |
WR:4325.66.09902.97 | Labour Cost for Gearbox standard overhaul To open up gearbox and clean all parts for inspection.To carry out NDT on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:45.0Z467420-11000 | Hydraulic Pump Standard Overhaul Labour charges to disassemble Hydraulic pump and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including function test | Enquire |
WR:456-9200 | Standard Overhaul of Hatch Cover - Control Block To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:462-9350 | Hydraulic Motor c/w Gearbox Standard Overhaul [GM2-3500] For Hydraulic Motor with Valve Block: Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing Included in overhaul cost: N/A For the gearbox: Labour charge to disassemble gearbox and clean all parts for inspection.To carry out NDT testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: NDT Testing Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:482746-001 | Worm Speed Reducer Standard Overhaul Labour charges to disassemble worm speed reducer and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:489.5253-801 | Hoisting Wire Sheave TOP URGENT Repairs Job scope: (1) To recondition bearing housing (2) To fabricate new sleeve and shrink fit it in place and positioned using grub screws. (3) New Bearing to be fitted onto Sheave Note: -Owner to supply bearing. -Price is quoted on Top Urgent Basis | Enquire |
WR:48BHN718/0-22 | Main Hoist Winch Brake Standard overhaul Labour charges to dismantle the brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts and pressure test it accordingly. Included in overhaul cost: Sandblasting/painting 3x coat marine grade paint, DFT 300µm Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:48BHN719/0-55 | Whipline winch brake Standard overhaul Labour charges to dismantle the brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts and pressure test it accordingly. Included in overhaul cost: Sandblasting/painting 3x coat marine grade paint, DFT 300µm Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:48BHN720/0-33 | Luffing winch brake Standard overhaul Labour charges to dismantle the brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts and pressure test it accordingly. Included in overhaul cost: Sandblasting/painting 3x coat marine grade paint, DFT 300µm Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:48BHN721/0-33 | Luffing winch brake Standard overhaul Labour charges to dismantle the brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts and pressure test it accordingly. Included in overhaul cost: Sandblasting/painting 3x coat marine grade paint, DFT 300µm Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:490.4086-801 | Replacement of Bearings on Wire Sheave, Luffing (3 pcs) (Top Urgent Basis) - To remove existing bearing on rope sheave - To re-assemble rope sheave with new bearing Note: - Price is including overtime & excluding parts, machining and consumables | Enquire |
WR:490.6143-801 | Replacement of Bearings on Wire Sheave, Hoisting (4 pcs) (Top Urgent Basis) - To remove existing bearing on rope sheave - To re-assemble rope sheave with new bearing Note: - Price is including overtime & excluding parts, machining and consumables. | Enquire |
WR:5.1905.1910046 | Planetary Gearbox Standard Overhaul Model : ZHP 5.1905.1910046 To open up gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:5004050_HB | Hoisting Brake Unit Standard Overhaul: To open up brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts and pressure test it accordingly. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:5004050_LB | Luffing Brake Unit Standard Overhaul: To open up brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts and pressure test it accordingly. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:5005087 | Jib Hinge Bearing Housing (Standard Overhaul) Labour charges to disassemble Jib Hinge Bearing Housing, remove existing bearing and clean all parts for inspection, to re-assemble with new bearing, seal and with broken parts renewed / repaired. Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:5005109 | Fabrication of Pin and Covers for 3x Rope Sheave Installation | Enquire |
WR:5005112 | Fabrication of Pin and Covers for 4x Rope Sheave Installation x1 Pin for HookBlock - Material : 4340 x2 Cover for HookBlock - Material : 4140 | Enquire |
WR:5005146 | Standard Overhaul of Slewing Gearbox To open up winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears.To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:5005192 | To fabricate Oil Cooler as per customer's sample. Note: Price offered is without E-Motor | Enquire |
WR:5005198 | Hoisting Gearbox Standard Overhaul Labour charges to dismantle hoisting winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears.To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:5005199 | Luffing Winch Gearbox Standard Overhaul Labour charges to open up luffing winch gearbox and clean all parts for inspection. To carry out NDT testing on all bearing seating faces and gears.To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: NDT Testing Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:5005200 | Luffing Winch Gearbox Standard Overhaul Labour charges to dismantled gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears.To establish a detailed report of findings. To re-assemble with new parts and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:5005289 | Luffing Winch Gearbox Standard Overhaul Labour charges to dismantle Luffing winch gearbox and clean all parts for inspection To carry out crack testing on all bearing seating faces and gears To establish a detailed report of findings To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:5006364 | SWL 36T 2-Fall Standard Overhaul Labour charges to dismantle the Hookblock, clean and inspect, perform NDT testing on all load bearing areas / rope sheaves / axle & seating surfaces, dimensional check of all seats / axle / rope sheave groove / bearing seats, re-assemble with new bearings and seals and screws, secure with lock wire & lock nuts, conform to DROPS, full documentation. Included in overhaul cost: - Stencil SWL on rope sheave block - NDT testing of sheave block after onshore load testing Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, Load testing and recertification. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:5007926 | Hoisting Winch Gearbox Standard Overhaul Labour to dismantle gearbox and clean all parts for inspection. To carry out NDT testing on all bearing seating faces and gears.To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: NDT Testing Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:5013780 | Hydraulic Pump Standard Overhaul (TBA) To open up Hydraulic Pump and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. For the control block performance will only be determine during testing once the motor has been overhauled. Including Testing Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:502022414 | Hoisting Brake Unit Standard Overhaul: To open up brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:505.9200 | Standard Overhaul of Hatch Cover Control Valve Block Labour charges to disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble complete unit & carryout pressure test of assembled block. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:505069814 | Distributor Gearbox Standard Overhaul Labour charges to disassemble distributor gearbox and clean all parts for inspection. To carry out NDT testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: NDT testing Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday | Enquire |
WR:50930301 | Cathead Hydraulic Cylinder(50930301) Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts, machining, manufacturing, consumable, honing & chroming. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:510223914 | A2F22W1Z6, HYDRAULIC MOTOR SERIAL NO: 1223821 | Enquire |
WR:510235114 | Hoisting Motor c/w Counter balance Valve Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: Bearings & Seals Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:5110411 | IHI HVLG-SS Single Shaft Hydraulic Motor Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. -Price mentioned is purely for repairing the motor excluding the control valve. | Enquire |
WR:5110417 | IHI HVLG-DSS Double Shaft Hydraulic Motor Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday -Price mentioned is purely for repairing the motor excluding the control valve. | Enquire |
WR:5110513 | IHI HVKG Hydraulic motor Standard Overhaul To open up Hydraulic Motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing Note: -Price excludes overtime,parts, machining / manufacturing costs and consumables. -Price mentioned is purely for repairing the motor excluding the control valve. | Enquire |
WR:5110513 - CVB | Standard Overhaul of Control Block To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:5110513R | *Repair of Windlass Hydraulic motor complete with control valves | Enquire |
WR:5110626 | HVNP-DS(DC) Hydraulic motor Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday -Price mentioned is purely for repairing the motor excluding the control valve. | Enquire |
WR:511636514 | Standard Overhaul of Lowering Brake Valve To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:512232014 | Hoisting Motor c/w Valve Block Standard Overhaul Labour charges to disassemble hydraulic motor & valve block and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:512233314 | Crane Hydraulic Motor Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: Bearings & Seals Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:512293414 | Hydraulic Pump (Tandem) Standard Overhaul Labour charges to open up Hydraulic Pump (front & rear) and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: Bearings, Seals & Testing Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. -For the control block, performance will only be determine during testing once the motor has been overhauled. | Enquire |
WR:512400614 | Enquire | |
WR:513320214 | Luffing Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts, machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:5141212 | IHI Motor - Control Valve Overhaul To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:5161112 | Hydraulic Control Valve Block (hoisting) Standard Overhaul Make: IHI Type: DC-LA-GM To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Included in overhaul cost: Pressure testing Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:5161322 | DC-NS-GM Hydraulic Control Valve Block (Luffing) Standard Overhaul Labour charges to disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Included in overhaul cost: Pressure testing Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:51910029 | Windlass Planetary Gearbox Standard Overhaul Labour charges to disassemble gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:51V250 | Hydraulic Motor Standard Overhaul Type: 51V250 To open up Hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing Included in overhaul cost: Bearings, Seals & Dynamic Testing Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:540057014 | Rope Winch Standard Overhaul Labour charges to dismantle winch gearbox and clean all parts for inspection.To carry out crack testing on all bearing seating faces and gears.To establish a detailed report of findings.To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: -Price is excluding overtime, parts, machining / manufacturing costs and consumables. -Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:540209514 | Main Hoist Winch Overhaul To open up main hoisting winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:540209514-Brake unit | Brake unit fromSennebogen 690s Winch Standard Overhaul To open up brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:540263214 | Overhaul Rope Winch 25T (Luffing) Labour and workshop cost for dismantle / assemble, clean for inspection, NDT testing of all gears and shafts, replace all bearings and seals, replace all screws, touch up painting, function test with test report. Note: Price excludes parts, overtime (urgent basis), machining and fabrication and full scale sandblasting / painting (if required). | Enquire |
WR:540268514 | Overhaul Rope Winch 15T (Aux. Hosit) Labour and workshop cost for dismantle / assemble, clean for inspection, NDT testing of all gears and shafts, replace all bearings and seals, replace all screws, touch up painting, function test with test report. Note: Price excludes parts, overtime (urgent basis), machining and fabrication and full scale sandblasting / painting (if required). | Enquire |