You're viewing a static version of our catalog. For live search:
We respond within 1–2 business days.
Part Number | Description | Action |
---|---|---|
WR:ChainBlock10Tx5m | 10Ton x 5Mtrs Chain Block c/w M.O.M. Testing Certification | Enquire |
WR:CHROMING CYLINDER | CYLINDER ROD REPAIR-FULL CHROMING | Enquire |
WR:CHZ3024-14.7692 | Slewing Gearbox Standard Overhaul Labour charges to disassemble slewing gearbox and clean all parts for inspection, to carry out crack testing on all bearing seating faces and gears, to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:CID110-01-303 | Hydraulic Cylinder Standard Overhaul: Specs: Bore Diameter: 110mm, Piston Rod Diameter: 60mm, Stroke: 2300mm, Working Pressure: 150 Bar, Max. Pressure: 210bar Labour charges (only) to open up cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test with 210 bar on piston side and 210 bar on ring side. ($2200/unit) Addtional work for servicing and testing of Counterbalance Valve block ($600) Note: Price excludes overtime, materials and additional work such as chroming, honing & machining work. | Enquire |
WR:Class_Surveyor | Engagement of Surveyor (+10% at cost) To arrange for Surveyor to witness the proof load testing and issuance of statement of fact report upon completion. | Enquire |
WR:Class_Surveyor (1) | Engagement of Surveyor (+10% at cost) To arrange for Surveyor to witness the proof load testing and issuance of statement of fact report upon completion. | Enquire |
WR:Class_Surveyor (2) | SWL 140T Single-Fall Hook Block (Tba) Engagement of Surveyor (+10% at cost) To arrange for Surveyor to witness the proof load testing and issuance of statement of fact report upon completion. | Enquire |
WR:Compensator Unit | Compensator Unit Standard Overhaul Dismantle compensator unit, clean for inspection, re-assemble with new seals at high / low pressure side and N2 side. Included pressure test cylinder HP & LP side Included in overhaul cost: N/A Note : - Excluded from our offer are overtime, parts, machining, manufacturing, consumable, honing & chroming. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public holiday. | Enquire |
WR:Consumables | To open up brake assy and clean all parts for inspection, to carry out checks on all parts, to establish a detailed report of findings, to re-assemble with new bearings, seals and worn brake disc. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:Control Block Overhaul | Control Block Standard Overhaul To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, check on spool / lever functionality, re-assemble with purchased parts. Includes testing Included in overhaul cost: O-rings and testing Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:Control Block Overhaul (1) | Standard Overhaul of Control valve Block (Portside Crane) To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:Control Block Overhaul (2) | Standard Overhaul of Control valve Block (Stbd Crane) To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:Control Block Repair | Charges for Inspection and Testing of Valve Block Dismantle and clean for inspection, assemble, test electrical solenoids, function and pressure test Note: Price is without overtime, parts,machining / manufacturing costs and consumables. | Enquire |
WR:ControlValve | Control Valve Standard Overhaul To disassemble control valve, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Included in overhaul cost: Seals & Testing Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:Coremo-brakes | Disc Brake Assembly Standard Overhaul Labour charges to dismantle the disc brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts and pressure test it accordingly. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:Coupling puller | Enquire | |
WR:CPHFL-72S-5 | Hoisting Gearbox Standard Overhaul Labour charges to disassemble hoisting gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:CRA82177E000 | ER Crane Travelling Motor Standard Overhaul Work scope for Rewinding of Stator coil: 1. Dismantle the unit and separate the bearings & Coupling 2. Conduct electrical test like DLRO, IR test, Surge & Impedance check 3. Take the winding data of the stator coil 4. Remove the stator coil 5. Clean the lamination from debris 6. Re-insulate the stator lamination 7. Rewind the stator coil 8. Double dip varnish the stator coil with class H insulation varnish and bake into oven 9. Clean the rotor and parts with steam and chemical and bake into oven 10. Dynamic balancing of the rotor 11. Run-out check on rotor shaft 12. Renew DE & NDE Bearings by bearing heater (Price will be quote after dismantling & Inspection) 13. Overhaul the brake assembly 14. Clean the brake coil, Bad, Hub and spring 15. Conduct Electrical test on the brake system 16. Measure the bearing housing and journals dimensions 17. Assemble the unit 18. Conduct No Load Run Test 19. Provide Service report | Enquire |
WR:Crane | Crane Standard Overhaul | Enquire |
WR:Crane Jib | Enquire | |
WR:Crane Jib Rep Proc | To draft Boom Steel Repair Procedure includiung Drawings, Material Specification and WPS, ready for submission to Class | Enquire |
WR:Crane_basket | Crane Basket as per dimensions provided by Owner Parts included in offer: -4-Legged steel wire Ø18mm with both end Eye x 2 mtr -D-Shackle– 4 pcs -Lifting Hook Ring (yellow colour) – 4 pcs Note: -Price excludes overtime, load test and transport charges | Enquire |
WR:CVG Block | Standard Overhaul of CVG Control Block Labour charges to disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:Cyl.Change-out HH-Crane | To Change Lufing Cylinder of HH Crane (at SGP Anchorage) | Enquire |
WR:Cyl_Hard.Chrome | Hard Chrome coating Traditional Hard Chroming Process •Grind Rod O.D. to base of coating and corrosion pits •Apply Hard Chrome process with over coat for finish grinding •Grind and lap to seal quality surface finish to 0.4 microns Ra or better •Dimensional check before delivery Note: Price stated is without overtime and subject to actual condition of surface during inspection and / or chroming process | Enquire |
WR:Cyl_Nickel.Chrome | Nickel Chromium Boron Alloy coating HVOF coating system (High Velocity Oxy Fuel) for excellent wear and corrosion resistance •Grind Rod O.D. to base of coating and corrosion pits •Apply Nickel Chromium Boron composite powder with overspray for finish grinding •Grind and lap to seal quality surface finish to 0.4 microns Ra or better •Apply capillary sealer •Check coating integrity with NDT process •Dimensional check before delivery Note: Price stated is without overtime and subject to actual condition of surface during inspection and / or chroming process | Enquire |
WR:Cyl_TungstenCC.Chrome | Tungsten Carbide Cobalt Chromium Alloy coating HVOF-system coating system (High Velocity Oxy Fuel) for excellent wear and corrosion resistance •Grind Rod O.D. to base of coating and corrosion pits •Apply Tungsten Carbide Cobalt Chromium composite powder with overspray for finish grinding •Grind and lap to seal quality surface finish to 0.4 microns Ra or better •Apply capillary sealer •Check coating integrity with NDT process •Dimensional check before delivery Note: Price stated is without overtime and subject to actual condition of surface during inspection and / or chroming process. Any additionally requested coating thickness beyond 0.4microns RA will be charged proportionate at 40 % of quoted price. | Enquire |
WR:Cylinder | Hydraulic Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts, machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:Cylinder (1) | Hydraulic Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Note: Price excludes overtime, parts, consumables and machining works such as chroming & honing & others. | Enquire |
WR:Cylinder (2) | Hydraulic Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Note: Price excludes overtime, parts, consumables and machining works such as chroming & honing & others. | Enquire |
WR:Cylinder_OH dia 260 | Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Note: Price excludes overtime, parts, consumables and machining works such as chroming & honing & others. | Enquire |
WR:CylinderSK_260 | Standard Cylinder Sealkit | Enquire |
WR:D-FH | Free fall lifeboat Hydraulic Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:D11-44275 | Brake Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:D1197-A0004 | HydraRacker x-y GRIP HEAD 3 1/2" - 9 3/4" standard overhaul on TOP TOP URGENT BASIS over the weekend. Labour cost for dismantling the unit completely, clean and inspect the complete structure, perform NDT testing on all load bearing areas & re-assemble complete unit with new parts. Including funtion testing. Note: -Price is excluding parts, machining / manufacturing costs and consumables. -Price includes overtime over the weekend as the unit has to be repaired on top top urgent basis and also includes function testing cost. -Lead time 3 days | Enquire |
WR:D128-K160 | Standard Overhaul of Gear Reducer for Shift Winch Unit Assy, Dwg 214242 To open up gear reducer and clean all parts for inspection. To establish a detailed report of findings To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:D202H | Hydraulic Pump Standard Overhaul (TBA) To open up Hydraulic Pump and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:D3R9104580 | Relief Valve Standard Overhaul (Top Urgent Basis) To open up and clean all parts for inspection, polishing all spools, change all seals & fittings, Hoses, Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:D80S-5 | To carry out fabrication of Hydraulic Cylinder as follow: 1. One pc of Cylinder Barrel – To provide labour, tools, material & equipment to carry out fabrication, machine to size, OD 75mm x ID 63mm x TL.1000mm. as per your drawing given. 2. One pc of Cylinder Piston Rod – To provide labour, tools, material & equipment to carry out fabrication, machine to size, OD 31.8mm x TL.1080mm. as per your drawing given. Note: Price is without overtime, parts, testing and transportation charges | Enquire |
WR:DavitCrane | Rescue Boat Davit Overhaul Provision of Labour, Facillity, Equipment and tools to remove/re-install all components that are overhauled, clean hydraulic tank, replace hoses & fittings where required & carryout touch up painting. Note: Price excludes overtime, parts, machining works & transportation | Enquire |
WR:DC-10-38-00 | Rope Sheave Standard Overhual (Top urgent overhaul) Labour charges: - To remove existing bearings and clean all parts for inspection, - To power brush sheave to bare metal at critical area and carryout NDT Test - To to establish a QC report - To carryout touch up paint - To assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price excludes parts, machining works and consumables. | Enquire |
WR:DDKC-3026-HGB | Hoisting Gearbox Standard Overhaul Labour charges (only) to disassemble hoisting gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: -Price is excluding overtime, parts, machining / manufacturing costs and consumables. -Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection -Inspection charges for gearbox only: Option 1: Dismantling / inspection only (25%) ($950/unit) Option 2: Dismantling / inspection / assembly without repair. (50%) ($1900/unit) | Enquire |
WR:Delivery/Collection | Customer to arrange for delivery/collection of cargo to/from Alatas Workshop. | Enquire |
WR:DEM140/90-550 | Hydraulic Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Note: Price excludes overtime, parts, consumables and machining works such as chroming & honing & others. | Enquire |
WR:DEPV-0310-HW-01 | Hoisting Winch Standard Overhaul Labour charges to disassemble hoisting winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts(other than mentioned above), machining,manufacturing & consumables costs. - In case of urgency we will charge additionalcosts of 50% on Weekdays and 80% onWeekends / Public Holiday. | Enquire |
WR:DFA2104590 (No.7) | Anchor Windlass Bush (SF) To provide labour, tools, material (BC6) & equipment to carry out fabrication, machine anchor windlass bush to size as per drawing provided by customer. | Enquire |
WR:DH-SG-DC-12 Control Block | Standard Overhaul of Control Block (1x Nos. per grab) To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Price includes Oring Kit Note: Price is without overtime, other parts, machining / manufacturing costs and consumables. | Enquire |
WR:DHC-2020-04-Pos15 | Slewing Gearbox Standard Overhaul Labour charges to dismantle slewing gearbox and clean all parts for inspection.To carry out crack testing on all bearing seating faces and gears.To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: -Price is excluding overtime, parts, machining / manufacturing costs and consumables. -Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection -Inspection charges will be charged if final repair offer is rejected or if unit is found to be beyond economical repair. | Enquire |
WR:DHC-2020-04-Pos18 | Slewing Hydraulic Motor Standard Overhaul Model: F12-30 as per drawing Labour charges to dismantle Slewing hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing Parts Included: Seal-kit, bearings, sealing plugs & bolts & Piston Rings. Note: -Price is without overtime, other parts, machining /manufacturing costs and consumables. -Inspection is on FOC basis | Enquire |
WR:DHC-HD-1523-Pos25 | Counterbalance valve block Standard Overhaul Labour charges to dismantled the valve block and clean all parts for inspection, polishing all spools, change all seals & fittings. Note: -Price is without overtime, parts, machining / manufacturing costs and consumables. -Inspection charges will be charged if final repair offer is rejected or if unit is found to be beyond economical repair. | Enquire |
WR:DHP32F20B | Standard Overhaul of Pilot Operated Control Valve Luffing To open up and clean all parts for inspection, polishing all spools, change all seals & fittings. Upon re-assembly with new parts, control valve to be bench tested. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:DHP40F21E | Directional Control Block (Slewing) Standard Overhaul Labour charges to disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:Distributor | Distributor Valve Standard Overhaul To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:DMMK10067 | Rewinding of Electric Motor 90KW Work scope for Rewind of AC Motor : 1. Dismantle the motor and remove the bearings 2. Conduct electrical test like DLRO, IR test, Surge Test 3. Take the winding data 4. Remove the old burnt coil 5. Clean the lamination 6. Insulate the lamination 7. Rewind the new coil with brake coil taping 8. Double dip varnish the stator and bake into oven 9. Clean the rotor and parts and bake into oven 10. Dynamic balancing of Rotor 11. Run out check on the rotor shaft 12. Renew DE & NDE Bearings 13. Renew of space heater 14. Measure the bearing housing and journal dimension 15. Assemble the motor 16. Conduct Electrical Test Again 17. Provide Final report Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. | Enquire |
WR:DOWNMAX ME100 HYDRAULIC MOTOR | Overhaul of Downmax ME100 Hydraulic motor | Enquire |
WR:DRE-H501-01-08 | Standard Overhaul of Load Control Valve To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs but including seals | Enquire |
WR:DS26-WG-25 | Hook Block Assy 30T Standard Overhaul Labour charges to dismantle the Hookblock, clean and inspect, perform NDT testing on all load bearing areas / rope sheaves / axle & seating surfaces, dimensional check of all seats / axle / rope sheave groove / bearing seats, re-assemble with new bearings and seals and XYLON coated screws, secure with lock wire & lock nuts, conform to DROPS, full documentation. Included in overhaul cost: - Stencil SWL on rope sheave block - NDT testing of sheave block after onshore load testing Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, Load testing and recertification. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:DSA6399010 | SWL30ton 2-Fall Hook Block Standard Overhaul Labour charges to dismantle the Hookblock, clean and inspect, perform NDT testing on all load bearing areas / rope sheaves / axle & seating surfaces, dimensional check of all seats / axle / rope sheave groove / bearing seats, re-assemble with new bearings and seals and XYLON coated screws, secure with lock wire & lock nuts, conform to DROPS, full documentation. - Stencil SWL on rope sheave block - NDT testing of sheave block after onshore load testing Note: Price is excluding overtime, parts, machining / manufacturing costs, sandblasting / painting and consumables. | Enquire |
WR:DSB3386-3 | Control Valve Standard Overhaul Labour charges to dismantle control valve and clean all parts for inspection, polishing all spools, change all seals & fittings. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:DSC0112848-26 | Control Valve Standard Overhaul Labour charges to dismantle control valve and clean all parts for inspection, polishing all spools, change all seals & fittings. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:DSC0118170 | Accident Boom Repair MHI 30.5t x 26m To supply Labour, Materials (ST52/S355/EH36, MILD STEEL A36/SS400/S235/S275), tools, equipment, machinery and facility: -To crop off 2x damaged boom sections -To pre-fabricate 2x new boom section, beam length 4000mm -To install & full weld newly pre-fabricated 2x boom sections -NDT testing (UT/MPI) -Water level & alignment of complete boom -Shot blasting primer coat on prefabricated section -Wire brush & roller paint primer on welding seams after completion -Material testing for 2x thickness (if required) Note: -Included are only materials as mentioned -Not included are any parts and any steel repairs not mentioned, or any steel repairs beyond boom section prefabrication length 4000mm | Enquire |
WR:DSC2101710 | Hydraulic Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts, machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:DSC2102130 | Overhaul of Brake Cylinder, Hoisting | Enquire |
WR:DSC2102521 | Luffing Hydraulic Motor Standard Overhaul To carryout standard overhaul of Hydraulic Motor for Luffing To open up Hydraulic Motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Includes back-pressure test & also full hydraulic load of the brake to check if there is slippage. Note: Price is without overtime,parts, machining / manufacturing costs and consumables. | Enquire |
WR:DSC2102580-1/5 | Main Pump Standard Overhaul Labour charges to disassemble hydraulic pump and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:DSC2102630 | Luffing Winch Reducer Gearbox Overhaul (Top Urgent Basis) Labour charges to disassemble luffing winch gearbox and clean all parts for inspection.To carry out NDT testing on all bearing seating faces and gears.To establish a detailed report of findings.To re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is excluding parts, machining / manufacturing costs and consumables. | Enquire |
WR:DSC2104250 | Hoisting Gearbox Standard Overhaul Labour charges to disassemble hoisting gearbox and clean all parts for inspection. To carry out NDT testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: NDT Testing Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:DSC2104251 | Hoisting Gearbox Standard Overhaul Labour charges to disassemble gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:DSC2104450E | Oil Cooler Standard Overhaul (On top urgent basis) Labor charges to carryout chemical cleaning of the oil cooler and pressure test to locate the exact leaking point. Note: -Price includes overtime but excludes parts, machining cost. -This type of special full aluminum cooler is difficult to repair. Hence, no warranty will be provided for the repair. | Enquire |
WR:DSC2104460 | Hydraulic Vane Pump (Main) Standard Overhaul Brand: Denison Hydraulics Model: T6EE 062 052 2L14 A12 M0 + T6CC 017 017 3L03 C100 Labour charges to disassemble hydraulic pump and clean all parts for inspection, to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing Note: -Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:DSC3101961 | Control valve standard overhaul To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:DSC3102221 | Control valve standard overhaul To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:DSC3102801 | Control Valve for Luffing (32A) standard overhaul To disassemble valve, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:DSD0100524-16 | Hoisting Motor Standard Overhaul Model: TMK-33A-M Labour charges to disassemble Hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:DSD0129872 | Crane Boom No.4 Repair > Repair of Crane Jib Sections - 02 X Sections Approx Length. 2000mm each To provide labour, materials, tools & euipment, machinery & facilty to carryout the following repair: -To offload/load of Crane Jib at Alatas Workshop -To crop off existing damaged 2x Jib sections of est length 2000MM each -Install & full weld newly fabricated Jib sections & carryout NDT (UT/MPI). -Wire brush & roller paint primer coat on repaired crane jib sections & water hose levelling Note: -Price excludes overtime, parts, transportation, machining, sandblasting/painting, removal/installation on site, material testing & classification society. | Enquire |
WR:DSD1100207 | Rope Sheave Overhaul - To remove existing bearings and clean all parts for inspection, - To power brush sheave to bare metal at critical area - To carry out crack testing on all bearing seating faces, welding seams & load bearing areas - To measure Rope Sheave groove area - To to establish a QC report - To re-paint sheave with x1 layer of primer - To assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price excludes, parts, machining works, overtime and consumables. | Enquire |
WR:DSD1100270 | Jib Sheave Assembly (on Top Urgent Basis, Weekend & Night shift) Labour cost to remove 5x rope sheaves from sheave pin, clean and inspect all parts, carry out NDT testing on 3x rope sheaves and sheave pin, replace bearings on 3x rope sheaves and paint with marine grade paint, replace 2x rope sheaves (customer supply), reassemble complete rope sheave assembly Note: Price excludes parts, fabrication and machining costs. | Enquire |
WR:DSD2100052 -1 | Enquire | |
WR:DSD2100052 1/6 | Hydraulic Vane Pump Standard Overhaul Model: T7EEC-052-052-025-2L34-A1M070 Labour charges to dismantle Hydraulic pump and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. For the control block performance will only be determine during testing once the pump has been overhauled. Including Testing Parts Included: Bearings & Seals Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:DSD2100052 1/6 (1) | 1.T7EEC 052 052 025 2L34 A1M070: Serial # 14D07382 Parts damaged/ worn & to be replaced: • Seal Kit • Bearings • P2 Pump Cartridge | Enquire |
WR:DSD2100052 1/6 (2) | Overhaul of T7EEC 052 052 025 2L34 A1M070: Serial # 14F27191 Parts damaged/ worn & to be replaced: • Seal Kit • Bearings • P2 Pump Cartridge Additional works to be done • Rework Shaft – To chrome seal area | Enquire |
WR:DSD2100052 1/6 (3) | Overhaul of T7EEC 052 052 025 2L34 A1M070: Serial # 14D07393 Parts damaged/ worn & to be replaced: • Seal Kit • Bearings • P2 Pump Cartridge Additional works to be done • Rework Shaft – To chrome seal area | Enquire |
WR:DSD2100080 | Hoisting Gearbox Standard Overhaul Type: MRP1702W-560 Labour charges to disassemble hoisting gearbox and clean all parts for inspection. To carry out NDT testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: NDT Testing Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:DSD2100920 | Slewing Gearbox Standard Overhaul To dismantle gearbox and clean all parts for inspection.To carry out crack testing on all bearing seating faces and gears.To establish a detailed report of findings.To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, Load testing and recertification. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:DSD2102290 | Hoisting Reduction Gearbox Standard Overhaul Labour charges to disassemble hoisting reduction gearbox and clean all parts for inspection. To carry out NDT testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: NDT testing Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:DSD2103591 | Hoisting Gearbox Standard Overhaul Labour charges to disassemble hoisting winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:DSD3103175 | Control Block Standard Overhaul To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:DSD3105880 | Standard Overhaul of Counterbalance Valve Block Assy To disassemble valve block, clean to proper and inspect, replace all o-rings, re-assemble and carryout pressure testing. - ($1200) Note: Price quoted excludes costs for overtime, machining, manufacturing & consumables. | Enquire |
WR:DW1010-2535-110-00 | To carry out fabrication of Hydraulic Cylinder as follow: 1. One pc of Cylinder Barrel – To provide labour, tools, material & equipment to carry out fabrication, machine to size, per your drawing given. 2. One pc of Cylinder Piston Rod – To provide labour, tools, material & equipment to carry out fabrication, machine to size. as per your drawing given. 3. One oc of Holding Valve- To provide labour, tools, material & equipment to carry out fabrication, machine to size. as per your drawing given. Note: Price is without overtime, parts, testing and transportation charges | Enquire |
WR:DW1010-255-100-00 | To carry out fabrication of Hydraulic Cylinder as follow: 1. One pc of Cylinder Barrel – To provide labour, tools, material & equipment to carry out fabrication, machine to size, per your drawing given. 2. One pc of Cylinder Piston Rod – To provide labour, tools, material & equipment to carry out fabrication, machine to size. as per your drawing given. 3. One oc of Holding Valve- To provide labour, tools, material & equipment to carry out fabrication, machine to size. as per your drawing given. 4. Complete Tube assy and all connector (External) Note: Price is without overtime, parts, testing and transportation charges | Enquire |
WR:E-Motor | Electric Motor Standard Overhaul and Rewinding Motor Details: No Nameplate Details, Customer Specified details: 12.4KW, 440V, 60HZ, Assumed 4 pole, 3 phase, AC Motor with Brake Unit Work scope to Overhaul and Rewind AC Motor: - Dismantle the unit and separate the bearings - Conduct electrical test like DLRO, IR test, Impedance Balance test - Take the winding data from the stator coil - Remove the failed stator coil - Clean the stator lamination and remove the debris - Re-insulate the lamination - Rewind the stator coils - Double dip varnish the stator coil and bake into oven - Remove the excess varnish - Clean the rotor and parts with steam and chemical and bake into oven - Dynamic balancing of Rotor - Run out check on the rotor shaft - Renew DE & NDE Bearings (Price to be quoted separately) - Renew Oil Seals/V-rings (Price to be quoted separately) - Overhaul of brake unit - Measure bearing housing and journal dimension - Assemble the motor - Conduct final electrical test | Enquire |
WR:E-Motor (1) | Electric Motor Standard Overhaul Rewinding of 45Kw, 4 Pole motor stator (round wires winding only) Jobscope: -Dismantle motor, draw out rotor and bearings -Strip off existing stator coils and clean with hot water -Re-insulate core slots with nomex insulation paper -Rewind stator coils as per original specification -Hot dip in varnish and bake in oven -Assemble the motor and perform free/No Load testing. | Enquire |
WR:E-Motor (2) | Electric Motor Standard Overhaul Motor Details: SIEMENS, 13.8/24 kW 2- Seed Motor Work scope for Rewinding of AC Motor: 1. Dismantle the unit and separate the bearings & Coupling 2. Conduct electrical test like DLRO, IR test, Surge & Impedance check 3. Take the winding data on dual speed stator coil 4. Remove the burnt coils 5. Clean the stator lamination and reinsulate 6. Rewind the dual speed coil 7. Double dip varnish the stator coil and bake into oven 8. Remove the excess varnish 9. Clean the rotor and parts with steam and chemical and bake into oven 10. Run out check on rotor shaft 11. Dynamic Balancing of Rotor 12. Renew DE & NDE Bearings (Price will be quoted after proper dismantling and inspection) 13. Renew V-Rings (Price will be quoted after proper dismantling and inspection) 14. Renew Oil Seals (Price will be quoted after proper dismantling and inspection) 15. Renew Thermostat / Thermistor (Price will be quoted after proper dismantling and inspection) | Enquire |
WR:E-Motor (3) | Electric Motor Standard Overhaul Motor Details: SIEMENS, 13.8/24 kW 2- Seed Motor Work scope for Rewinding of AC Motor: 1. Dismantle the unit and separate the bearings & Coupling 2. Conduct electrical test like DLRO, IR test, Surge & Impedance check 3. Take the winding data on dual speed stator coil 4. Remove the burnt coils 5. Clean the stator lamination and reinsulate 6. Rewind the dual speed coil 7. Double dip varnish the stator coil and bake into oven 8. Remove the excess varnish 9. Clean the rotor and parts with steam and chemical and bake into oven 10. Run out check on rotor shaft 11. Dynamic Balancing of Rotor 12. Renew DE & NDE Bearings (Price will be quoted after proper dismantling and inspection) 13. Renew V-Rings (Price will be quoted after proper dismantling and inspection) 14. Renew Oil Seals (Price will be quoted after proper dismantling and inspection) 15. Renew Thermostat / Thermistor (Price will be quoted after proper dismantling and inspection) | Enquire |
WR:E-Motor replacement | IHI-Wuhan SS 36200 – 280B E-motor repolacement at onboard, Budget estimate. To supply labour, material, tools, equipment, machinery and facilities to carry out workscope as per enclosed attachment | Enquire |
WR:E0186 | 3-Jaw Gear puller (Heavy Duty) | Enquire |
WR:E13 | Control Valve standard overhaul To disassemble valve , clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:E130474 | SWL10Te Single Fall Hook Assembly Standard Overhaul - To open up Hook Assembly and clean all parts for inspection - To carry out crack testing on all bearing seating faces, welding seams & load bearing areas - To establish a QC report - To assemble with new bearings, seals and with broken parts renewed /repaired. Note: - Price is w/o overtime, parts, machining and w/o bearings and consumables. - Job scope to be carried out under 100% Drops Compliant | Enquire |
WR:E130479 | Single Fall Hook, SWL 15T Standard Overhaul Dismantle the hook block and clean for inspection, perform NDT testing on all load bearing areas - hook / trunnion / hook housing, dimensional inspection report, replace Thrust bearing, replace all screws with XYLON coated screws, use of lock wire and lock nuts, overhauled hook to conform to DROPS, stencil SWL, complete documentation. Note: Price is excluding parts, machining / manufacturing costs, sandblasting / painting and consumables. | Enquire |
WR:E140454 | 3-fall hook block, SWL 120T Standard Overhaul Dismantle the hook block and clean for inspection, perform NDT testing on all load bearing areas - hook / trunnion / side shields / all seats / rope sheaves and pin, dimensional inspection report, replace Thrust bearing, rope sheave bearings, replace all screws with XYLON coated screws, use of lock wire and lock nuts, overhauled hook block to conform to DROPS, stencil SWL, complete documentation. Note: Price is excluding parts, machining / manufacturing costs, sandblasting / painting and consumables. | Enquire |