You're viewing a static version of our catalog. For live search:
We respond within 1–2 business days.
Part Number | Description | Action |
---|---|---|
WR:E4210 | Complete Block Assy (Manifold Block) Standard Overhaul To disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:EC-740-AFZ-EX-SST | To re-charge ex-proof cctv camera | Enquire |
WR:EC0000-561006-0000 | Hoisting Winch Traverse E-Motor (Standard Overhaul) 1. Dismantle the unit and separate the bearings & Coupling 2. Conduct electrical test like DLRO, IR test, Surge & Impedance check 3. Clean the stator coil with steam and chemical and bake into oven 4. Repeat the cleaning process until IR value improve 5. Clean the rotor and parts with steam and chemical and bake into oven 6. Varnish the stator coil and bake into oven 7. Remove the excess varnish 8. Dynamic balance the rotor is not offered due to small in size 9. Run-out check on rotor shaft 10. Measure the bearing housing and journals dimensions 11. Assemble the unit 12. Dismantle brake assembly 13. Check the space heater 14. Check the PTC Thermistor 15. Renew bearings on DE & NDE sides 16. Conduct No Load Run Test 17. Provide Service report Note: -Price excludes overtime, parts, consumables and any machining works if required | Enquire |
WR:EGF 24,0-1,15-12500 | Repair of 1x dented grab shell To provide facility, material, equipment, tools and labour to repair 1x damaged grab shell: - To unload / load the grab at the facility - To remove both grab shells to inspect all pins and bushes - To cut / bend and renew 1x bottom plate on the damaged grab shell, material S355 / EH36 - To cut / bend and renew 1x side plate on the damaged grab shell, material S355 / EH36 - To cut and renew all 3x lips on the repaired grab shell, est. 6m length, material Hardox 400/450 - To clean and paint the repair area with primer . - To install both grab shells and replace bushes and pins where required Note: Not included are parts, machining / fabrication costs others than already mentioned above and transport of the grab from and to vessel | Enquire |
WR:EGF_Cyl_Seal_Change | EGF Grab Cylinder Seal change-out | Enquire |
WR:EH50-Monorail-Air-Hoist | JD Neuhaus EH50 Monorail Air Hoist Chain Hoist Standard Overhaul Chain Hoist: Dismantle unit and hook, clean and inspect, perform NDT testing on all load bearing areas / sprockets / wheels, assemble with new bearings and seals, screws. ($4,200.00) Chain: clean Chain and perform EDDY current on complete chain (80m long), oil chain for delivery ($2,300.00) Sandblasting / Painting required ($700.00) Note: Price is excluding parts, machining / manufacturing costs and consumables. | Enquire |
WR:EH75-Monoral-Air-Hoist | JD Neuhaus EH75 Monorail Air Hoist Chain Hoist Standard Overhaul Chain Hoist: Dismantle unit and hook, clean and inspect, perform NDT testing on all load bearing areas / sprockets / wheels, assemble with new bearings and seals, screws. ($6,200.00) Chain: clean Chain and perform EDDY current on complete chain (50m long), oil chain for delivery ($3,500.00) Sandblasting / Painting required ($4300.00) Note: Price is excluding parts, machining / manufacturing costs and consumables. | Enquire |
WR:EHSH120/60X Cylinder | Standard Overhaul of Hydraulic Cylinder - Tobu Grab Hydraulic Cylinder To open up cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test with xxx bar on piston side and 100 bar on ring side. (Excluding overtime, materials and additional work such as Chroming & honing & machining work) | Enquire |
WR:Electric Chain Hoist (2 ton) | Electric Chain Hoist (2 ton) Standard Overhaul Gearbox Overhaul: To dismantle gearbox and clean all parts for inspection.To establish a detailed report of findings.To re-assemble with new bearings, seals and with broken parts renewed / repaired. E-Motor Overhaul: -Dismantle motor, draw out rotor and bearings -Strip off existing stator coils and clean with hot water -To establish a detailed report of findings. -Assemble the motor with new bearings, seals and with broken parts renewed / repaired and perform free/No Load testing. Note: Price is excluding overtime, parts, machining / manufacturing costs and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:ELECTRIC STROKER | 5A Electric stroker S23-12416-0 | Enquire |
WR:EP596 | Hydraulic Pump Standard Overhaul Labour charges to disassemble Hydraulic pump and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Parts Included : Bearing Kit & Seal Kit Note: Price is without overtime, other parts, machining / manufacturing costs and consumables. | Enquire |
WR:EPA142 | Interzinc 52 Grey Part A | Enquire |
WR:EPA177 | Interzinc 52 Part B Tropical | Enquire |
WR:F11-150 | Hydraulic Motor F11-150 Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: Bearings & Seals Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:F11-23-002 | Life Boat Davit Hydraulic Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:F12-60-RF-IH | Hydraulic Pump Standard Overhaul To open up Hydraulic pump and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:F2-7317 | Hoisting Hydraulic motor (HVKG-DSS) Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts,machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. -Price mentioned is purely for repairing the motor excluding the control valve. | Enquire |
WR:F2-7318 | Hoisting Hydraulic motor (HVKG-SS) Standard Overhaul Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts,machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. -Price mentioned is purely for repairing the motor excluding the control valve. | Enquire |
WR:F220GB-421D3 | F220 Gearbox Standard Overhaul Scope of work: - Disassembly of gearbox into component pieces - Clean all parts and inspect - Compile and issue an inspection report based on findings - Supply new bearings and seal kits (gearbox planetary gear bearings and mechanical face seals are not included at this stage, these will be inspected and it will be advised if they are recommended to be replaced) - Overhaul components being reused - Rebuild - Bench rotational test only and issue test report - Paint to offshore paint/corrosion protection system (system 7) - Pack ready for shipping | Enquire |
WR:F220GB-521XL | F220 Gearbox Standard Overhaul Desc : 521XL Model F220 S/No : Scope of work: - Disassembly of gearbox into component pieces - Clean all parts and inspect - Compile and issue an inspection report based on findings - Supply new bearings and seal kits (gearbox planetary gear bearings and mechanical face seals are not included at this stage, these will be inspected and it will be advised if they are recommended to be replaced) - Overhaul components being reused - Rebuild - Bench rotational test only - Paint to offshore paint/corrosion protection system (system 7) - Pack ready for shipping - Workshop reports submission Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:F260GB-421D3 | F260 Gearbox Standard Overhaul (Labour charges waived) Desc : Model F260 S/No : 129 Scope of work: - Disassembly of gearbox into component pieces - Clean all parts and inspect - Compile and issue an inspection report based on findings - Supply new bearings and seal kits (gearbox planetary gear bearings and mechanical face seals are not included at this stage, these will be inspected and it will be advised if they are recommended to be replaced) - Overhaul components being reused - Rebuild - Bench rotational test only and issue test report - Paint to offshore paint/corrosion protection system (system 7) - Pack ready for shipping Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:F3-10565 | Boom Repair IHI H305185-240, Boom Dwg F3-10565 , No.3 Cargo Crane Jib Damage Repair Work Scope of works: -Upon arrival of barge in Alatas jetty, to arrange crane & unload the crane at our Waterfront jetty. -Carry out offloading at Alatas Waterfront yard and arrange temporary jig to place -Check general alignment with water level prior to commence repair works. -Crop and renew damaged jib plate at Alatas workshop. -Check general alignment with water level after completion of repair works. -Carry out 100% UT and Painting works. -Arrange shore crane to load onto the barge and carry out sea fastening works. Note: -Quotation based on drawing and specifications given and if any variation in job scope subject to Final Inspection / Class requirement, a revised quotation will be submitted for approval. -Price includes material (ABS EH36 or equivalent), painting of affected areas with 1x layer of primer & NDT test. Price excludes classification surveyor, final paint, transportation & overtime. | Enquire |
WR:F3-10593-A | Rope Sheave Standard Overhual (Top urgent overhaul) - To remove existing bearings and clean all parts for inspection, - To power brush sheave to bare metal at critical area - To to establish a QC report - To re-paint sheave with x1 layer of primer - To assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price excludes, parts, machining works and consumables. | Enquire |
WR:F3-10720-14 | Fabrication of Eyebolt As per Drawing F3-10720 | Enquire |
WR:F3-10720-BB | Luffing Band Brake Set Standard Overhaul (Upper + Lower) Labour charges to remove existing brake linings and clean all parts for inspection.To carry out crack testing on brake band's bare metal surface area upon removing existing brake linings. To re-assemble with new brake linings. Note: Price is excluding all machining works, overtime. | Enquire |
WR:F3-10721 | Luffing Brake Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:F3-10820 | 2-Fall Cargo Block SWL 30T Standard Overhaul Labour charges to dismantle the Hookblock, clean and inspect, perform NDT testing on all load bearing areas / rope sheaves / axle & seating surfaces, dimensional check of all seats / axle / rope sheave groove / bearing seats, re-assemble with new bearings and seals and XYLON coated screws, secure with lock wire & lock nuts, conform to DROPS, full documentation. Included in overhaul cost: - Stencil SWL on rope sheave block - NDT testing of sheave block after onshore load testing Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, Load testing and recertification. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:F3-11549 | 2-Fall Cargo Block SWL 30T Standard Overhaul Labour charges to dismantle the Hookblock, clean and inspect, perform NDT testing on all load bearing areas / rope sheaves / axle & seating surfaces, dimensional check of all seats / axle / rope sheave groove / bearing seats, re-assemble with new bearings and seals and screws, secure with lock wire & lock nuts, conform to DROPS, full documentation. Included in overhaul cost: - Stencil SWL on rope sheave block - NDT testing of sheave block after onshore load testing Note: - Excluded from our offer are overtime, parts, machining, manufacturing, Load testing and recertification. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:F3-9471 | Hoisting Brake Cylinder HC205C Type Standard Overhaul Labour charges to disassemble hoisting brake cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Note: Price excluding overtime, parts and machining works. | Enquire |
WR:F3-9511-D | Hoisting Single Rope Sheave Standard Overhual (Normal Basis) - To remove existing bearings and clean all parts for inspection, - To power brush sheave to bare metal at critical area - To to establish a QC report - To re-paint sheave with x1 layer of primer - To assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price excludes, parts, machining works and consumables. | Enquire |
WR:F3-9956 | Hoisting Brake Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:F3-9996-1 | Hoisting Band Brake Set Standard Overhaul (Upper + Lower) Labour charges to remove existing brake linings and clean all parts for inspection.To carry out crack testing on brake band's bare metal surface area upon removing existing brake linings. To re-assemble with new brake linings. Note: Price is excluding all machining works, consumables & overtime. | Enquire |
WR:F360GB-721XL | F360 Gearbox Standard Overhaul Scope of work: - Disassembly of gearbox into component pieces - Clean all parts and inspect - Compile and issue an inspection report based on findings - Supply new bearings and seal kits (gearbox planetary gear bearings and mechanical face seals are not included at this stage, these will be inspected and it will be advised if they are recommended to be replaced) - Overhaul components being reused - Rebuild - Bench rotational test only and issue test report - Paint to offshore paint/corrosion protection system (system 7) - Pack ready for shipping | Enquire |
WR:F4-12757-A | Electric Motor Standard Overhaul 1. Dismantle the unit and separate the bearings, brake & Coupling 2. Conduct electrical test like DLRO, IR test, Surge & Impedance check 3. Clean the stator with chemical and Steam and bake into oven 4. Varnish the stator coil and bake into oven 5. Remove the excess varnish 6. Clean the rotor and parts with steam and chemical and bake into oven 7. Remove the brake unit and conduct Electrical test 8. Clean and bake the brake coil 9. Dynamic balance the rotor assembly 10. Run-out check on rotor shaft 11. Renew both end bearings and oil seal if any 12. Measure the bearing housing and journals dimensions 13. Assemble the unit 14. Conduct No Load Run Test 15. Provide Service report Note: Price excludes overtime, parts, machining works and consumables. | Enquire |
WR:FA150KGI-MR12A1-W2-CE | Man Riding Winch Standard Overhaul Dismantle, clean and inspect, perform NDT testing on all load bearing areas and gears, assemble with new bearings and seals, touch up paint overhaul all control valves and switches, leak test and function test with repair certificate. Winch unit: ($2,000.00) Controls: (TBA) Sandblasting / Painting: ($700.00) Note: Price is excluding parts, machining / manufacturing costs and consumables. | Enquire |
WR:FA2.5I-24MK1GJ1235P | Utility Air Winch Standard Overhaul Dismantle, clean and inspect, perform NDT testing on all load bearing areas and gears, assemble with new bearings and seals, touch up paint overhaul all control valves and switches, leak test and function test with repair certificate. Winch unit: ($4,500.00) Controls: ($1,200) Sandblasting / Painting: ($2,000.00) Note: Price is excluding parts, machining / manufacturing costs and consumables. | Enquire |
WR:FA5I-24MK1GJ1235P | Utility Air Winch Standard Overhaul Dismantle, clean and inspect, perform NDT testing on all load bearing areas and gears, assemble with new bearings and seals, touch up paint overhaul all control valves and switches, leak test and function test with repair certificate. Winch unit: ($5,000) Sandblasting / Painting: ($2,000.00) Note: Price is excluding parts, machining / manufacturing costs and consumables. | Enquire |
WR:FA5I-24XK1GPU | Utility Air Winch Standard Overhaul Dismantle, clean and inspect, perform NDT testing on all load bearing areas and gears, assemble with new bearings and seals, touch up paint overhaul all control valves and switches, leak test and function test with repair certificate. Winch unit: ($7,000) Sandblasting / Painting: ($2000.00) Note: Price is excluding parts, machining / manufacturing costs and consumables. | Enquire |
WR:Fabricate -MSW.PIPE | Fabrication & supply of Main Sea water pipe Pipe 16" x OD 420 mm x Sch80 Length of pipe (Flange to flange): 1005mm x 1pc Flange 400A JIS 5K x 2pcs Flange Thickness : 25mm, PCD : 495 mm, No. of holes: 16 Material of pipe : Mild Steel pipe, SCH80 Note: * Pipe Internal Coating shall be excluded * Onboard installation Shall be excluded * Apply shop primer paint on pipe external | Enquire |
WR:Fabrication | Fabrication cost (add details in clear text) | Enquire |
WR:Fabrication (1) | Fabrication cost (add details in clear text) | Enquire |
WR:Fabrication (2) | Fabrication cost (add details in clear text) | Enquire |
WR:Fabrication (3) | Fabrication cost (add details in clear text) | Enquire |
WR:Fabrication works-AID | Enquire | |
WR:Fairlead | Fairlead Standard Overhaul To provide facility & labour charges to disassemble the fairlead and clean all parts for inspection. To carry out thickness measurement of the material & NDT testing of the complete unit & the rope sheave. Carryout dimensional check on the rope sheave grooves. To re-assemble with new parts where required. Included in overhaul cost: NDT testing Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:FDM04 | Hydraulic Control Valve Block Standard Overhaul Labour charges to disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, check on spool / lever functionality, re-assemble with new parts. Including pressure testing. Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:FDM08CRBMS | Hydraulic Control Valve Block Standard Overhaul Labour charges to disassemble valve block, clean to proper and inspect, replace all O-rings, valve seal sets, check on spool / lever functionality, re-assemble with new parts. Including pressure testing. Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:FE2C | Control Valve standard overhaul To disassemble valve , clean to proper and inspect, replace all O-rings, valve seal sets, re-assemble and carryout pressure testing. Note: Price is without overtime, parts, machining / manufacturing costs and consumables. | Enquire |
WR:FF06-08-05 | Life Boat Hydraulic Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing, consumable, honing & chroming. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:FFLBCylinder | Free Fall Lifeboat Cylinder Standard Overhaul Labour charges to dismantle the hydraulic cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts, machining, manufacturing, consumable, honing & chroming. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:FL7,5M.18C-AO | Complete Brake unit for main winch Standard Overhaul [FL750.14C/065/../00-OR] Labour charges to disassemble brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts. Note: Price is without overtime, parts, machining/ manufacturing costs and consumables. | Enquire |
WR:FL750 | Complete Brake Unit Standard Overhaul [FL750..] Labour charges to disassemble brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts. Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:FloatingCrane | 300T Floating Crane Offer (see seperate offer) | Enquire |
WR:FLS960-BrakeUnit | Complete Brake Unit Standard Overhaul [FLS960] Labour charges to disassemble brake unit and clean all parts for inspection, to establish a detailed report of findings, to reassemble with new parts. Including pressure testing with test report. Included in overhaul cost: Sandblasting/painting 3x coat marine grade paint, DFT 300µm Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:FLUKE233 | REMOTE DISPLAY TRUE RMS MULTIMETER (FLUKE-233) | Enquire |
WR:FLUKE419D | FLUKE Laser Distance Meter, Model 419D | Enquire |
WR:FMW32-16182 | Windlass Hydraulic Motor Standard Overhaul Labour charges to disassemble windlass hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: N/A Note: -Price offered is for Motor Only & excludes control valve -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:FOOTER | WR:FOOTER | Enquire |
WR:FRCdavit-Cylinder | FRC Davit Hydraulic Cylinder Standard Overhaul Labour charges (only) to disassemble cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test it accordingly. Addtional work for servicing and testing of Counterbalance Valve block ($200) Note: Price excluding overtime, parts and additional work such as Chroming & honing & machining work. | Enquire |
WR:G28H1810-1HC36 | E-Motor Rewinding Motor Details: Siemens, Type: ELM0-G 2BH1810 1HC36, 11kW, 400/690V, 25/14.4A, 2940Rpm, 50HZ, 2 pole, 3 phase Work scope for Rewinding of AC Motor: 1. Dismantle the unit and separate the bearings & Coupling 2. Conduct electrical test like DLRO, IR test, Surge & Impedance check 3. Take the winding data on stator coil 4. Remove the burnt coils 5. Clean the stator lamination and remove the debris 6. Re-insulate the lamination 7. Rewind the coil 8. Double dip varnish the stator coil and bake into oven 9. Remove the excess varnish 10. Clean the rotor and parts with steam and chemical and bake into oven 11. Dynamic balancing of Rotor 12. Run out check on the rotor shaft 13. Renew DE & NDE Bearings 14. Renew Oil Seals/V-rings 15. Measure the bearing housing and journal dimension 16. Assemble the motor 17. Conduct Electrical Test Again Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables costs. | Enquire |
WR:G3000457E | Hoisting Gearbox Standard Overhaul Labour charges to disassemble hoisting gearbox and clean all parts for inspection. To carry out NDT testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: NDT testing Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:G3023174E | Luffing Gearbox standard overhaul Dismantle, clean and inspect, perform NDT testing on all gears / carriers / shafts, assemble with new bearings and seals, leak test and function test, separate leak test on the brake pressure unit. Note: Price is without overtime, parts (others than mentioned above), machining / manufacturing costs and consumables. | Enquire |
WR:G3036849E | Overhaul of slewing gearbox Model: MRP173D-355-210 To open up slewing gearbox and clean all parts for inspection.To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed /repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs,storage cost and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:G3036862E | Hoisting Gearbox Standard Overhaul Labour charges to disassemble hoisting gearbox and clean all parts for inspection. To carry out NDT testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: NDT testing Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:G3047654E | Hoisting Gearbox Standard Overhaul (for Deck Crane Type MHI 35t electro-hydraulic crane) Model: MRP1702W-560-58A Labour charges to disassemble hoisting gearbox and clean all parts for inspection.To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed /repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs,storage cost and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:G3047763E | Overhaul of Luffing Gearbox Pos 46 of Winch Unit Assy 227169F | Enquire |
WR:G3061949E | Slewing Gearbox Standard Overhaul (for Deck Crane Type HDHS3022) Model: MRP 1744D-375 Labour charges to disassemble slewing gearbox and clean all parts for inspection.To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed /repaired. Note: Price is excluding overtime, parts, machining / manufacturing costs,storage cost and consumables. Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:G3073876E-1 | Hoisting Gearbox Standard Overhaul Labour charges to disassemble gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Including function testing. Note: -Price is excluding overtime, parts, machining / manufacturing costs and consumables. -Required parts, machining work, manufacturing of gear wheels etc. will be offered after inspection | Enquire |
WR:G3119236E | Hoisting Gearbox Standard overhaul Details: For 45T x 28M Crane MRP1743W-560-79 Labour charges to disassemble hoisting winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:G3999096 | Gearbox Standard Overhaul To open up Gearbox and clean all parts for inspection, to carry out crack testing on all bearing seating faces and gears, to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Note: Price is without overtime, broken parts replacement, machining/ manufacturing costs. | Enquire |
WR:G479 | Fukushima G479 Hydraulic pump | Enquire |
WR:Gangway hoist | Gearbox (for Gangway hoist) Standard Overhaul Labour charges to disassemble gangway hoist winch gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:GB54S0003PI | Repair of Kobelco Crane 7055 controller *Scope of work: - Inspection with report - Refurbishment of PCB - Renewal of necessary components - Bench test | Enquire |
WR:Gearbox | Gearbox Standard Overhaul Labour charges to disassemble gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:Gearbox (1) | Gearbox Standard Overhaul Labour charges to disassemble gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:Gearbox (2) | Slewing Gearbox Standard Overhaul Labour charges to disassemble slewing gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:Gearbox (3) | Travelling Gearbox Standard Overhaul Labour charges to disassemble slewing gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: -Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:Gearbox (4) | Hoisting Gearbox Standard Overhaul Labour charges to disassemble gearbox and clean all parts for inspection. To carry out crack testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (others than mentioned above), machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:GENERAL GRAB OVERHAUL (1) | WR:GENERAL GRAB OVERHAUL (1) | Enquire |
WR:GENERAL GRAB OVERHAUL (2) | WR:GENERAL GRAB OVERHAUL (2) | Enquire |
WR:GENERAL GRAB OVERHAUL (3) | WR:GENERAL GRAB OVERHAUL (3) | Enquire |
WR:GENERAL GRAB OVERHAUL (4) | WR:GENERAL GRAB OVERHAUL (4) | Enquire |
WR:GENERAL GRAB OVERHAUL (5) | WR:GENERAL GRAB OVERHAUL (5) | Enquire |
WR:GENERAL GRAB OVERHAUL (Pricing) | WR:GENERAL GRAB OVERHAUL (Pricing) | Enquire |
WR:GM2-3500 | Hatch Cover Hydraulic Motor c/w Gearbox Standard Overhaul [GM2-3500] For Hydraulic Motor with Valve Block ($2780/unit): Labour charges to disassemble hydraulic motor and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing Included in overhaul cost: N/A For the gearbox ($4200/unit): Labour charge to disassemble gearbox and clean all parts for inspection.To carry out NDT testing on all bearing seating faces and gears. To establish a detailed report of findings. To re-assemble with new bearings, seals and with broken parts renewed / repaired. Included in overhaul cost: NDT Testing Total: $2780+$4200=$6980/unit Note: -Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:GM35VL-A | Winch Hyd. Motor c/w Reduction Gearbox Standard Overhaul Labour charges to disassemble Hydraulic Motor and clean all parts for inspection, to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Pressure testing (not included) Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables costs. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekends / Public Holiday. | Enquire |
WR:Gouging | Removal cost of seized Hook Trunnion Nut on urgent basis | Enquire |
WR:GPP1-A0C40 | Hydraulic Gear Pump Standard Overhaul Labour charges to disassemble hydraulic pump and clean all parts for inspection,to establish a detailed report of findings, to re-assemble with new bearings, seals and with broken parts renewed / repaired. Including Testing. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts, machining, manufacturing & consumables. - In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:Grab _RCG24.0-2.5-12000_OH | Shanghai Shuoli remote controlled grab type RCG24.0-2.5-12000 Overhaul Workshop General Cost For provision of Labor, Facility, Equipment and tools to remove all grab shells and pressure rods, inspect hinges and bushes (replace where required), remove rope sheaves and replace bearings, NDT test all hinge areas and pins, reassemble complete grab, replace hyd. Hoses, clean hyd. Tank and fill new hyd. Oil, grab function test. Provide complete report with all test reports and material certificates where applicable. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts (other than mentioned above), machining, manufacturing, consumables costs, sandblasting / painting / any repair weld. -All machining / welding works to be quoted upon arrival of grab to alatas workshop and after carrying out thorough inspection. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:Grab(Rental) | Grab Rental Brand: Smag peiner Model: MZGL 12000-6-B Grab Capacity: 12m3 at S$ 6,700 / month Note: -Minimum rental period: 1 Month -Payment of 2x monthly rent in advance -Security deposit: Bank guarantee over the full grab value of $80,0000, payable in 12 months, unless cancelled by us (i.e. upon return of the grab, less repair costs) -Grab maintenance / repair cost upon return of the grab at cost. | Enquire |
WR:Grab(Sales) | Grab For Sale Brand: Smag peiner Model: MZGL 12000-6-B Grab Capacity: 12m3 | Enquire |
WR:Grab-Ash Grab | SMAG PEINER ASH GRAB MTGL 2000-3 Workshop General Cost For provision of Labour, Facility, Equipment and tools to dismantle / reassemble the grab with new hinge pins and bushes, remove / reinstall all components, replace all hydraulic hoses, clean hydraulic tank and fill new hydraulic oil. Included in overhaul cost: N/A Note: - Excluded from our offer are overtime, parts, machining, manufacturing, consumables costs, sandblasting / painting / any repair weld. -All machining / welding works to be quoted upon arrival of grab to alatas workshop and after carrying out thorough inspection. -In case of urgency we will charge additional costs of 50% on Weekdays and 80% on Weekend / Public Holiday. | Enquire |
WR:Grab-Orange Peel | Orange Peel Grab MMGL 8000-4 General Overhaul Workshop Cost To provide labour, equipment and facility to carry out following recommended Scope of Work: -Dismantle / assemble complete Grab / base unit / HPU -remove / install all 6x shells and replace pins and bushes where required -inspect shell tips and replace if required -remove / install six (6) lifting cylinders for recommended overhaul -remove / install E-motor for recommended overhaul -Inspect Connection box (insulation, terminals, plug connections) -remove / install hydraulic pump for recommended overhaul -remove / install hydraulic valve block for recommended overhaul -replace all hydraulic hoses and fittings (where required) -clean out hydraulic tank and fill up new hydraulic oil (393ltr), replace return filter -overhaul lubrication system and replace all lubrication hoses -remove / install top pins for inspection -NDT testing on all pins and load bearing welding seams | Enquire |
WR:Grab_Ctrl_Unit | Grab Control Unit Standard Repair: Workshop labour charges to renew 2-way valve, check, service & repair control system as needed. Test radio remote control system. (Repair Time: 1 week) (*) Price is without overtime, parts, and additional machining if required, but includes 2-way valve | Enquire |
WR:Grab_Cyl_Chroming | CHROMING OF CYLINDER ROD 1. Initial inspection and dimensional check on rod 2. Repair on badly pitted and scratch areas by means of welding to build up 3. Pre-machine of rod stroke length undersize for hard chrome preparation 4. Carry out hard chrome plating process on rod 5. Final grinding of rod to finished dimension 6. Final dimensional check prior assembly (Please note that straightening of rod will be quoted separately if required after straightness test, Honing on the barrels may be charged separately, | Enquire |
WR:Grab_Cylinder | To open up cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and pressure test with 260bar on piston side and 120 bar on ring side. (Excluding overtime, materials and additional work such as Chroming & honing & machining work) *** Budget price only, may be revised upon inspection *** | Enquire |
WR:Grab_Cylinder_Overhaul | Grab Cylinder Standard Overhaul: To open up cylinder for cleaning and inspection, to replace all seals, piston rod guide bush, sleeve and piston guide. Re-assemble cylinder and carry out pressure test. Note: Price is without overtime, parts, seals, chroming, straightening, machining costs and consumable which will be advice offered after inspection | Enquire |
WR:Grab_EGF_AR | SMAG GRAB EGF 24,0-1.25-1200 Acccident Repairs, Budget estimate To supply labour, material, tools, equipment, machinery and facilities to carry out workscope as per enclosed attachment | Enquire |
WR:Grab_EGF_OH (1/) | Enquire | |
WR:Grab_EGF_OH (1/3) | EGF Grab General Overhaul | Enquire |